{"id":1999,"date":"2024-04-19T10:40:38","date_gmt":"2024-04-19T08:40:38","guid":{"rendered":"https:\/\/pendelbushaven.be\/nieuws\/adjusted-timetable-works-beverentunnel\/"},"modified":"2024-04-22T13:40:42","modified_gmt":"2024-04-22T11:40:42","slug":"adjusted-timetable-works-beverentunnel","status":"publish","type":"post","link":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/","title":{"rendered":"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards"},"content":{"rendered":"\n<p><p style=\"font-weight: 400;\">Preparatory works for the renovation of the Beveren Tunnel began recently. To compensate for any delays, the Port of Antwerp Shuttle Bus (Pendelbus Haven van Antwerpen) will operate to <strong>a modified timetable on a number of routes from Monday 22 April 2024 onwards.<\/strong> This temporary timetable will remain in place until the works at the Beveren Tunnel are completed (in summer 2025).<\/p><\/p>\n\n<ul class=\"wp-block-list\">\n<li><p><strong>Beveren\/Melsele\/Zwijndrecht\/Fr. Van Eedenplein -&gt; Waaslandhaven:<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li><p>The services at <strong>06:50, 08:50 and 12:50<\/strong> will depart <strong>fifteen minutes earlier<\/strong> from the respective boarding points;<\/p><\/li>\n\n\n\n<li><p>Services at other times will not change.<\/p><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><p><strong>Van Eedenplein\/DEME (stopping point of DeWaterbus) -&gt; Waaslandhaven:<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li><p>The services at <strong>07:10 and 13:05<\/strong> will depart <strong>fifteen minutes earlier<\/strong> from the respective boarding points;<\/p><\/li>\n\n\n\n<li><p>Services at other times will not change.<\/p><\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><p><strong>Sint-Niklaas -&gt; Waaslandhaven:<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li>The services at 06:50 and 12:55 will depart fifteen minutes earlier from the respective boarding points;<\/li>\n\n\n\n<li><p>Services at other times will not change.<\/p><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p><p style=\"font-weight: 400;\">The updated timetable is available <a href=\"https:\/\/pendelbushaven.be\/en\/routes\/\">here<\/a>.<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>To compensate for any delays caused by the work taking place at the Beveren Tunnel, the Port of Antwerp Shuttle Bus (Pendelbus Haven van Antwerpen) will operate to a modified timetable on a number of routes from Monday 22 April 2024 onwards.<\/p>\n","protected":false},"author":3,"featured_media":1973,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[],"class_list":["post-1999","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shuttle-bus"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards - Pendelbus<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards - Pendelbus\" \/>\n<meta property=\"og:description\" content=\"To compensate for any delays caused by the work taking place at the Beveren Tunnel, the Port of Antwerp Shuttle Bus (Pendelbus Haven van Antwerpen) will operate to a modified timetable on a number of routes from Monday 22 April 2024 onwards.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"Pendelbus\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-19T08:40:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-22T11:40:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/pendelbushaven.be\/wp-content\/uploads\/2024\/04\/Ingang_Beverentunnel-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1706\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sigrid.borgmans@mlso.be\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sigrid.borgmans@mlso.be\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/\"},\"author\":{\"name\":\"sigrid.borgmans@mlso.be\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/#\\\/schema\\\/person\\\/66ce644d7ade50e948f965708ee05856\"},\"headline\":\"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards\",\"datePublished\":\"2024-04-19T08:40:38+00:00\",\"dateModified\":\"2024-04-22T11:40:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/\"},\"wordCount\":162,\"image\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pendelbushaven.be\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Ingang_Beverentunnel-scaled.jpg\",\"articleSection\":[\"Shuttle Bus\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/\",\"url\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/\",\"name\":\"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards - Pendelbus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/pendelbushaven.be\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Ingang_Beverentunnel-scaled.jpg\",\"datePublished\":\"2024-04-19T08:40:38+00:00\",\"dateModified\":\"2024-04-22T11:40:42+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/#\\\/schema\\\/person\\\/66ce644d7ade50e948f965708ee05856\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/pendelbushaven.be\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Ingang_Beverentunnel-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/pendelbushaven.be\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Ingang_Beverentunnel-scaled.jpg\",\"width\":2560,\"height\":1706,\"caption\":\"(c) Stefaan Van Hul\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/nieuws\\\/adjusted-timetable-works-beverentunnel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/\",\"name\":\"Pendelbus\",\"description\":\"Haven van Antwerpen\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/pendelbushaven.be\\\/en\\\/#\\\/schema\\\/person\\\/66ce644d7ade50e948f965708ee05856\",\"name\":\"sigrid.borgmans@mlso.be\",\"url\":\"#\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards - Pendelbus","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/","og_locale":"en_US","og_type":"article","og_title":"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards - Pendelbus","og_description":"To compensate for any delays caused by the work taking place at the Beveren Tunnel, the Port of Antwerp Shuttle Bus (Pendelbus Haven van Antwerpen) will operate to a modified timetable on a number of routes from Monday 22 April 2024 onwards.","og_url":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/","og_site_name":"Pendelbus","article_published_time":"2024-04-19T08:40:38+00:00","article_modified_time":"2024-04-22T11:40:42+00:00","og_image":[{"width":2560,"height":1706,"url":"https:\/\/pendelbushaven.be\/wp-content\/uploads\/2024\/04\/Ingang_Beverentunnel-scaled.jpg","type":"image\/jpeg"}],"author":"sigrid.borgmans@mlso.be","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sigrid.borgmans@mlso.be","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#article","isPartOf":{"@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/"},"author":{"name":"sigrid.borgmans@mlso.be","@id":"https:\/\/pendelbushaven.be\/en\/#\/schema\/person\/66ce644d7ade50e948f965708ee05856"},"headline":"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards","datePublished":"2024-04-19T08:40:38+00:00","dateModified":"2024-04-22T11:40:42+00:00","mainEntityOfPage":{"@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/"},"wordCount":162,"image":{"@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/pendelbushaven.be\/wp-content\/uploads\/2024\/04\/Ingang_Beverentunnel-scaled.jpg","articleSection":["Shuttle Bus"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/","url":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/","name":"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards - Pendelbus","isPartOf":{"@id":"https:\/\/pendelbushaven.be\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#primaryimage"},"image":{"@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/pendelbushaven.be\/wp-content\/uploads\/2024\/04\/Ingang_Beverentunnel-scaled.jpg","datePublished":"2024-04-19T08:40:38+00:00","dateModified":"2024-04-22T11:40:42+00:00","author":{"@id":"https:\/\/pendelbushaven.be\/en\/#\/schema\/person\/66ce644d7ade50e948f965708ee05856"},"breadcrumb":{"@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#primaryimage","url":"https:\/\/pendelbushaven.be\/wp-content\/uploads\/2024\/04\/Ingang_Beverentunnel-scaled.jpg","contentUrl":"https:\/\/pendelbushaven.be\/wp-content\/uploads\/2024\/04\/Ingang_Beverentunnel-scaled.jpg","width":2560,"height":1706,"caption":"(c) Stefaan Van Hul"},{"@type":"BreadcrumbList","@id":"https:\/\/pendelbushaven.be\/en\/nieuws\/adjusted-timetable-works-beverentunnel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/pendelbushaven.be\/en\/"},{"@type":"ListItem","position":2,"name":"Works on the Beveren Tunnel \u2013 adjusted timetable from Monday 22 April 2024 onwards"}]},{"@type":"WebSite","@id":"https:\/\/pendelbushaven.be\/en\/#website","url":"https:\/\/pendelbushaven.be\/en\/","name":"Pendelbus","description":"Haven van Antwerpen","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pendelbushaven.be\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/pendelbushaven.be\/en\/#\/schema\/person\/66ce644d7ade50e948f965708ee05856","name":"sigrid.borgmans@mlso.be","url":"#"}]}},"_links":{"self":[{"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/posts\/1999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/comments?post=1999"}],"version-history":[{"count":5,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/posts\/1999\/revisions"}],"predecessor-version":[{"id":2006,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/posts\/1999\/revisions\/2006"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/media\/1973"}],"wp:attachment":[{"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/media?parent=1999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/categories?post=1999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pendelbushaven.be\/en\/wp-json\/wp\/v2\/tags?post=1999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}